Woojin Entec signs contract for out-of-core neutron flux monitoring system maintenance service for Shin-Hanul Units 1 and 2
Predicted impact: Low· Actual: −33.9% vs sector, volume 29.3× normal (5 trading days)
Maintenance service contract for nuclear units; contract size not disclosed and likely small.