SK Broadband teams up with LS Marine Solution to enhance subsea cable reliability
Predicted impact: Low
Cooperation MOU on subsea cable reliability; no contract value disclosed, and similar items already reported.
060370 · KOSDAQ · ₩060370 · LS마린솔루션
Predicted impact: Low
Cooperation MOU on subsea cable reliability; no contract value disclosed, and similar items already reported.
Predicted impact: Low
Cable restoration cooperation MOU with no disclosed contract value.
Predicted impact: Low
Cooperation on subsea cable repair; no contract value disclosed.
Predicted impact: Low
Subsea cable operation MOU with SKB; no contract value disclosed and small relative to revenue.
Predicted impact: Low
MOU on subsea cable operations; no contract value disclosed.
Predicted impact: Low
MOU on subsea cable operations; no contract value disclosed.
Predicted impact: Medium
Q3 operating profit up 235%, a large swing, but profit is small; already reported several times this period.
Predicted impact: Medium
Q3 operating profit up 235%; large swing, though the absolute amount is small (₩6.9B).
Predicted impact: Low
Operating profit up 235% but only ₩6.9B, already reported in preliminary results.
Predicted impact: Low
Q3 operating profit up 235% was already reported; absolute profit is small.
Predicted impact: Medium
Q3 operating profit up 234.7% year on year, though the amount is small in won.
Predicted impact: Low· Actual: −4.2% vs sector, volume 1.1× normal (5 trading days)
Malaysia cable project of ₩820B order was already announced; start of work is not new size.
High impactPredicted impact: High· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Order worth ₩820B, about 292% of last year's revenue of ₩281B.
Predicted impact: Low· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Malaysia cable project already reported in the last 14 days; no new size disclosed.
Predicted impact: Medium· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Malaysia subsea cable project lifts backlog to ₩820B, a sizable order versus market value.
Predicted impact: Low· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Backlog of 820B won is large, but the Malaysia job's own size is not disclosed; backlog effect is modest.
Predicted impact: Low· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Overseas cable construction; contract size not disclosed.
Predicted impact: Low· Actual: +3.0% vs sector, volume 1.1× normal (5 trading days)
Construction start on Malaysian undersea cable project; contract value not disclosed relative to revenue.
Also known as: LS Marine Solution / LS마린솔루션 / 060370 / KRX:060370
Source: KRX statistical information